Iraq’s largest hydropower dam grinds to halt as water level falls to record low
BAGHDAD (AFP) – Record low water levels at Iraq’s largest hydroelectric dam have ground turbines there to a halt, amplifying a power shortage that led to riots last summer, a top official said on Thursday. Adel Mahdi, advisor to the electricity minister, said water levels at the Mosul dam on the Tigris River had fallen to 298 metres (977 feet) above sea level. “It is the first time since 1984 when the dam was built that water levels have fallen this low,” Mahdi told AFP. “The installed power generation capacity of Mosul’s hydroelectric plant is 1,175 megawatts, but the current production is zero, because the turbines need a minimum water level of 307 metres (1,007 feet) to operate,” he added. He said half of the water to the dam was coming from Turkey, and the rest from Iran and the mountains of Iraq. The Tigris and Euphrates which gave Iraq its ancient name of Mesopotamia, meaning “land of two rivers,” reach Iraq through Turkey. The Tigris flows directly from Turkey, and the Euphrates goes from Turkey through Syria, then flows to Iraq. Water projects in the two countries have had a severe impact on Iraq. Mahdi said Iraq also was eyeing with extreme worry Turkey’s controversial Aliso dam on the Tigris, work on which began in 2006. “If Aliso is completed, it will finish with the Tigris in Iraq completely,” Mahdi said. …